This weeks work? Feb. 24 to March 2
Week of Feb. 24 to March 2
Monday | | Tuesday | |||
Everyone | Turn in 3-4 elevations in the blog for discussion | | Nick, Daniel, Perla | Go to Boston Resource Center @ 9am | |
Everyone | Have a skype meeting @ 11:30pm select two best for model making | | Nick, Daniel, Perla | Start on the first full size model | |
Wednesday | | Thursday | |||
Peter, Nicole | Visit site to get the utilities location | | Daniel, Peter | Start on Second full Size Model | |
Friday | | Saturday/Sunday | |||
Everyone | Be in class by Noon | | | ||
Individual work:
· Wall Sections
· Research Hardware
· Look into corrugated metal roofing colors
· Look into corner designs for the new shed
· Look into window catalogs, pick windows for shed
February 5, 2012
December 2, 2011 Meeting with Penny
Bellow please find the main issues discuss about the boards:
- Water will be better outside the shed
- Water will be better outside the shed
- The electric meters are in the right side of the current shed
- Maintenance free siding is preferable
- Windows makes lattice shed less stable, fix design of lattice shed
- Penny will like to see samples of permeable concrete and know more about how it works
-Currently the shed is greatly inefficient and tools are not organized inside
- The slope of the ramp is OK but the ramp is a little too long, it needs to be a little shorter
- Color and material of roof still undefined
- Handicap Planters need to be incorporated in drawings
- Relocation of Shed leaves a space on top of hill, for potential Bulletin board or sign
- Need deeper studies of current spending, plan a budget and propose
you can find the boards in the following folder:
CharlestownCommunityGardenShed/FinalBoard 12-3-11/CCGS Final Design Boards 12-3-11
-Perla Muller
you can find the boards in the following folder:
CharlestownCommunityGardenShed/FinalBoard 12-3-11/CCGS Final Design Boards 12-3-11
-Perla Muller
Subscribe to:
Posts (Atom)