October 15, 2011

Schedule for this Week (10/15/11 - 10/21/11)

Meeting for this Week

Saturday/ Sunday (10/15/11 – 10/16/11)

Monday (10/17/11)

No Meeting

Nick, Perla, Elle and Nicole

Meeting Time

11pm

Post all due Work on Dropbox

Tuesday (10/18/11)

Wednesday (10/19/11)

No Meeting

Meeting Time

If it’s need it.

Expecting to conclude the work.

Thursday (10/20/11)

Friday (10/21/11)

No Meeting

Working with the Finals Boards.

Everyone

Meeting Time

1pm at BAC

List of what we have to be working on!!!!!! due: Wednesday (10/19/11)

Here is the list of what we have to be working on, for the Presentation on Friday (10/21/11):

-Diagram (scale: 1/8” = 1’-0”); PERLA

-Final Presentation Boards; PERLA

-Plan View & Elevations (scale: ½” = 1’-0”); NICOLE

-Section Details; NICOLE

-Materials Precedents; NICK

-Budget Graph.; NICK

-Tow Sections (scale: ½” = 1’-0”); ELLE

best regards, Nicole Pinot-Juan

Things to be done for October 17, Monday:

Hi Team,

Here are the things we have to be done for Monday (10/17/11):

- Materials Precedents (graph.); NICK

- Budget; NICK

- First Board Layout; PERLA

- Material Board from Site; ELLE

-Post the idea of layout that you are going to use for the materials board no later than Saturday; ELLE

Don't forget we have the meeting Monday (10/17/11) at 11pm.

October 14, 2011

Diagram for review!

Before

After


The diagram above descrives the ideas we talked about today. The latice shed rotates and moves closer to the sitting area. The Storage shed moves closer to the planting beds and the handicap planting beds are behind the latice. The one thing we considered was having two possible entrances to the shed. One for the handicap people and the other for the people that will work in the garden, we also thought this will provide an easier circulation pattern.

This diagram is up for discussion! so comment away! 

October 13, 2011

Reminder!!! :)

Hi team,

I'll like to let you know that this coming weekend we are going to have a lot of work to do. I need each one of you to work 100%, to be able to do a good presentation for next Friday with client. I hope to see you all tomorrow and pleas bring everything you need to have to be done for tomorrow.

Elle you can post the sketches that u did the las meeting in Dropbox. I already post the drawing that you need in dropbox. 

Just let me know if you have any questions. 

best regards,
Nicole

October 12, 2011

Yes we need to raise the Shed and yes the budget is five digits!

Todd
You have have stated the floor level well.  In raising the floor elevation, we need to make a clear and convincing proposal for doing so that relates to elevations beyond the shed itself. See you all Friday.
If any of you have time, see if there are images of the Provincetown Art Association Museum.  Some of the wall details are very interesting.
Rick
On Oct 11, 2011, at 6:02 AM, Lee Todd wrote:

> PERLA -
>
> 1. Raising the storage shed
> All schemes that we have agreed upon need to raise the floor level of the shed to respond to raising the ground level  outside, since it is necessary to cure the low spot and water collection.  So do incorporate this move in your solutions and the budget.
>
> 2. Budget Limit
> Generally the client has put the budget at $12,000 to $15,000 which is stated correctly in the Minutes.  However, we have have discussed that if there are design proposals which merit increasing that amount, they would be dealt with by:
>       (a) raising more money through additional grants, or fundraising for the current project, or
>       (b) phasing - doing additional work as a later phase(s).  Note that with this strategy the first phase must not be left with some sections not useful.  The Gardens must be functional at the end of each phase - for example, in the option to relocate the lattice pavilion, that structure would not be demolished and the ground restored to another use, until the new pavilion was complete, and the pavilion functions relocated.
>
> PAT, RICK -
> please add, comment or correct.
>
> TEAM -
> I regret that I will not be in town to see the progress you have made.  There were some strong design ideas in the works last week.  The client has agreed to participating in our Final design presentation week after next , 10/21.
>
> TODD
>
>
> TODD LEE    FAIA  LEED AP - ARCHITECT
>                           85 EAST INDIA ROW - 32H  BOSTON MA 02110
>                          617 320 3782  VOICE TXT
>
>                    todd@toddleearchitect.com
>
>
>
> On Oct 11, 2011, at 1:39 AM, Perla Muller wrote:
>
>> Hi Todd,
>>
>> We had a question in regards to raising the storage shed. Are we to consider this option and incorporate into our design? or this is out of the conversation and budget?
>>
>> Also there was some confusion about the budget we would like you to clarify, can you tell us what is the budget as of now. We are doing some material research and would like to take this into consideration when we pick materials for our design.
>>
>> thank you,
>>
>> Perla
>>
>

Things to be done by Friday, (10/14/11)

Hi Team,

Here are the things we have to be done for Friday (10/14/11):

- Research: Basin (water collector and how it connect with the roof) and

Corrugate Metal Roof; NICK

- Budget List and Detail Drawing connection of Roof; NICK

- Elevations and Plan View; NICOLE

- Research: Insulation Materials for Sheds and Interior Material; PERLA

- Sections Drawings through site (slope of site); PERLA

- Board of Existing Material on Site; ELLE

- Interior Elevations and Sections; ELLE

Remember to bring the research material that we are working on. Thank you guys to be able to put together our ideas for the Shed. Exited to see you Friday, 10/14/11. Good job team!!!

Best Regards,

Nicole Pinot-Juan