Hi Team,
Here are the things we have to be done for Friday (10/14/11):
- Research: Basin (water collector and how it connect with the roof) and
Corrugate Metal Roof; NICK
- Budget List and Detail Drawing connection of Roof; NICK
- Elevations and Plan View; NICOLE
- Research: Insulation Materials for Sheds and Interior Material; PERLA
- Sections Drawings through site (slope of site); PERLA
- Board of Existing Material on Site; ELLE
- Interior Elevations and Sections; ELLE
Remember to bring the research material that we are working on. Thank you guys to be able to put together our ideas for the Shed. Exited to see you Friday, 10/14/11. Good job team!!!
Best Regards,
Nicole Pinot-Juan