MINUTES – Meeting with Client – 9/30/2011, 2:00 pm – on site Page 1


1. INTRODUCTIONS

Client Representatives – Penny Carlhian, Roberta MacCarthy, Robert Spencer

Team members in attendance – Elle Coleman, Nicholas Joelli, Nnicole Pinot-Juan (Perla Muller out)

Project Supervisors – Todd Lee, Rick Lamb, Pat Welsh


2. OLD BUSINESS

Changes to minutes from meeting on 9/9/2011 will add once posted


3. MEMORANDUM OF UNDERSTANDING

approved


4. PROGRAM

Budget estimated around twelve thousand ($12,000) to fifteen thousand ($15,000) dollars

Five hundred ($500) dollars from Spalding to improve accessibility

Applied for three thousand ($3,000) dollar grant from big dig mitigation funds to improve accessibility

Value of items in tool shed estimated around two thousand five hundred ($2,500) dollars

Consideration of unknown underground utilities removed

Durability of structure expected comparable to existing shed


5. SCHEDULE

Budget set around end of November

Final documents presented mid-December

Parts of design prohibitive in current program should be considered for phasing in the future, but shed should be operational as soon as possible.


6. DESIGN OPTION #2, #1 PRESENTED

Elements of design client representatives found appealing:

-Sliding barn style doors

-Rain water recovery

-Ivy covered sign

-Green roof (most likely in future phases)

-Utilization of space between tool shed and seating area.

Elements of design that require consideration:

-Option #1 requires large new foundation, and movement of utility meters

-Durable translucent materials instead of glass

-Shed used heavily by many people

-Designs could be more industrial and eccentric